Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

There are total 200 students inClass 7 or samp. IF 60 apegirls. What is the part of thegirs? What is the? What isthe part of boys​
write a story which includes the words" when they entered the room we were impressed by what they were wearing
Michael scowls throughout "Seventh Grade" because he believes it willA.attract the girls'attentionB.make him seem ferocious.C.impress his older brother.D.show t
The proton has a mass of?
3.7+27 multipled by 5/7
In Passage 1, the reference to "bonds" (line 5) mainly serves to A insert a personal opinion into an otherwise objective discussion of social rights. B suggest
Solve the equation by inserting the assigned value. NH (6a - 10) = 12 – (6 - 3a), when b=11 A = ?
What is mercantilism: A nation's power depended on its farming production A nation's power depended on its military conquests A nation's power depended on its w
The bones in the backyard ___ to our neighbors dog.
Solve for A. F = m a