Eight workers took 2 1/4 days to dig half of a tunnel. If only two workers are going to finish the tunnel, how long will it take them?​

Respuesta :

gihit69776 gihit69776
  • 01-12-2020

Answer:

0.5625

Step-by-step explanation:

Answer Link

Otras preguntas

In which sentence does the prepositional phrase act as an adverb? A. Last evening, Anne suffered from a headache. B. The door to the attic was left open. C. Mr
Please help solve, thanks in advance!
Give a recursive algorithm for finding the sum of the first n odd positive integers.
which point is in the solution set to the system of inequalities: y>2x-1 and y<1/2x+5
In terms of weather, what kind of boundary does the line labeled X represent? A. occluded front B. stationary front C. cold front D. warm front
does a human body use neon???
why is it critical to your cells to be near capillaries
What is the additive inverse of -4a
Graph the six terms of a finite series where a1 = -3 and r = 1.5.
A standard coffee mug has a capacity of 16 fluid ounces. If Annie needs to fill 26 mugs with coffee, how many total quarts of coffee does she need?