as33080
as33080 as33080
  • 01-03-2021
  • Business
contestada

if you have identified a risk, you have?
(a) figured it out how to eliminate it.
(b) recognized that it exists.
(c) publically announced it is a problem.
(d) decided not to reveal it

Respuesta :

angelshorse27 angelshorse27
  • 01-03-2021

Answer:

B

Explanation:

you have recognized that it exists, you have not yet eliminated it or made any other decisions.

Answer Link

Otras preguntas

Plague is to insects as constellation is to?
Plague is to insects as constellation is to?
pls help with this, I don't understand at all
What is the next number 6,12,15,60,65,?
A specified example of adaptation in translation
6. Convert from radians to degrees. 22 15 O O 528° 264° 132° 792°
Need help on these problems very urgently !!
Which political party generally believes that it is the people's own responsibility to ensure their well-being?
John needs to drain the water from a tank with a hose. The water drains at a consistent number of gallons per minute. After 12 minutes, there are 432 gallons re
Jon and Austen got in trouble at football practice and have to run laps as a consequence. Jon, who runs at a rate of 3 laps per minute, had completed 10 laps al