razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

The points (1,r) and (0,-6) fall on a line with a slope of -4. What is the value of r? r=
Why is drip hiss fall a hyperbole ?
I need this in an ordinary number??
What is the common ratio of 2, 10/3, 50/9
List the rational numbers in least to greates 0.8,-1.4,0.75,-2.33,0.21
Displacement is to velocity as_____is to acceleration
how nature and nurture influences our psychological, physical and/or cognitive growth
A line has a slope of 1/7 and passes through the point (14,2). What is its equation in slope-intercept form?​
help please!! which figures ALWAYS have right angles
What is the slope between each pair of points. (-5,-2) and (9,2)​