ia04
ia04 ia04
  • 02-04-2022
  • Business
contestada

Part of the job for an architectural designer is obtaining which of the following from different contractors for a construction project?

A: A business license
B: A bid
C: Permission

Respuesta :

lilybsmith1999 lilybsmith1999
  • 02-04-2022

Answer:

B. A bid

Explanation:

Answer Link

Otras preguntas

Please help and explain how to do it
number of outer rings in cesium and magnesium??
what is the cost per unit
Which words in the sentence are the adverb clause? Although my grandmother works, she calls us every week to ask about our lives. A. she calls us B. every week
what is 10 to the 3rd power x n = 630
why is an objects density expressed as a combination of two units
According to Gibbon, in what ways has "primitive man progressed over time? what assures the author that this progress will continue?
find the slope of the line that goes through the points (-15,70) and (5,10) and (2,7) and (6,3).
In the case of cancer, uncontrolled cell division is a problem because it A. causes excessive white cell production. B. interferes with other cell replication.
If you have 13 oranges and u times it by 9 and than divide it by 3 add it to 65 take away 30 = ?????????? Wanna know