mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

When you weigh yourself, are you actually reading the support force acting on you, or are you really reading your weight?
I need help with density I don't get it at all
Chemical transmitters can stimulate any receptor site to initiate an action.
fructuse, sucrose, and starch are all examples of ? carbohydrates, lipids,nucleic acids or proteins?
members of which phylum contain stinging capsules that poison the entangled prey
write an equation with the solution x=25
Louann and Carla received equal scores on a test made up of multiple choice questions and an essay. Louann got 14 multiple choice questions correct and received
How do you work out 8 something 2 something 1 =24 ?
food A contains 150 calories in 3/4 of a serving. food B contains 250 calories in 2/3 of a serving. which food has fewer calories per serving?
drew's weekly allowance is $8. His friend jan's weekly allowance is $10. Drew spends $3 a week and jan spends $4 a week. WRITE TWO EXPRESSIONS TO SHOW HOW MUCH