carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

how did humayun died
Find the measures in the diagram.
Which of the following would be considered secondary sources? (Select all that apply.) historical documents results of an experiment magazines scholarly journ
nature is art of god (expansion of idea)​
When magnesium is burnt in air, a powdery ash X is formed, X on dissolving in water forms y.i)what are X and Y?​
MARTÍN: ¡Hola, Berta! ¿Cómo ______ ?
Why did the author choose to start the paragraph with a question? A. The author wanted to present a question that is at the heart of an age–old debate. B. The a
what is the answer for 2 divided by 78
How do solve this -16.29 ÷ 3.62?
A man used a force of 250 Newtons for 90 seconds to pull on a rock that remained stationary. How much work was done?