betsieldholt68
betsieldholt68 betsieldholt68
  • 03-01-2017
  • Mathematics
contestada

a machine takes 4.2 hours to make 7 parts. at that rate how many parts can the machine make in 28.8 hours

Respuesta :

nhatminh082004pc2e48
nhatminh082004pc2e48 nhatminh082004pc2e48
  • 22-07-2018
In 1 hour, a machine could make:
[tex]7 \div 4.2 [/tex]
parts
In 28.8 hours, that machine make
[tex]7 \div 4.2 \times 28.8 = 4.8[/tex]
parts
Answer Link
booggergirl
booggergirl booggergirl
  • 28-11-2018

Answer:

48 Parts

Step-by-step explanation:


Answer Link

Otras preguntas

What is d,the distance between tick marks on the number line
Iman ate 1/3 of a bag of popcorn. His 4 friends ate equal shares of the remaining popcorn. Which expression represents the popcorn that each friend ate? Plz
with what speed does a freely falling object dropped from a height of 88.2m hit the ground? how long does it take for it hit the ground?
PLEASE HELP ITS DUE IN 7 MINUTES!​
You should exercise for muscular fitness 2-3 times per week. A.True B.False
way did aunt jane retuse or lie down on the bed.ans​
What is sin 28°? plzzz help
A raindrop of radius r falls from a certain height h above the ground. The work done by the gravitational force is proportional to
Determine if each table represents a proportional relationship. If so, write the equation for the function in the form y = mx​
a landscaping store charges 12.50 per pound of gravel if you purchase 3 pounds or less. any gravel you purchase beyond the first three pounds costs $10 per poun